Apatent application was made in 1981 for the earth shattering invention of "the original – LUX ELEMENTS® hard foam support ELEMENT".
The construction panel for walls and floors LUX ELEMENTS®-ELEMENT
Construction panel for underfloor heating LUX ELEMENTS®-FLOOR
The installation cladding LUX ELEMENTS®-TEC
Bath surrounds LUX ELEMENTS®-TOP
The washstands LUX ELEMENTS®-LAVADO
Point drainage LUX ELEMENTS TUB®
Linear drainage LUX ELEMENTS TUB-LINE®
Modular room constructions LUX ELEMENTS®-MODUL-ROOM
Individual room constructions LUX ELEMENTS®-CONCEPT
Individual relaxation and distraction LUX ELEMENTS®-RELAX
The decorative elements LUX ELEMENTS®-DECO
The tried and tested accessories are fully harmonised for processing ELEMENT. Specially developed adhesives and mortars, sealing tapes, mounting angles and plugs ensure problem-free processing.
Fastening set and dowels LUX ELEMENTS®-FIX
Technical fixtures, Heating, Lighting and Sound LUX ELEMENTS®-ADD
Adhesives LUX ELEMENTS COL®
Sealing filler and sealing tapes LUX ELEMENTS®-DRY
Reinforce LUX ELEMENTS ARM®
Mounting aids LUX ELEMENTS MONT®
LUX ELEMENTS®-...-PLUS Individual, special manufacture for each product group
In addition to standard products, also individually tailored and specially manufactured products are available for the products groups listed under the designation ‘PLUS‘.
Sizes, shapes, thicknesses etc., that deviate from standard features can be inquired from LUX ELEMENTS. After successful verification of implementation possibility at LUX ELEMENTS an appropriate offer will be prepared. Once an order is placed, it will be manufactured and delivered accordingly.
Overview of All Issues
LUX ELEMENTS GmbH & CO KGAn der Schusterinsel 7D - 51379 Leverkusen-OpladenTelefon +49 (0) 21 71/ 72 12 - 0Telefax +49 (0) 21 71/ 72 12 20
Practical instructions
Application areas
Construction & design
Practical examples
Installation video
Current trade fair dates
Make the bathtub cladding without footboard
Cut out identically sized supports for the step from residual material. Glue together with COL-MK at regular intervals on the floor and bathtub exterior.
Apply COL-MK to exposed top and side edges of the support elements. Apply in a snake-like pattern.
Cut out the front and top sides of the steps from residual material. First glue on the front section, then the top section.
Additionally fix the top and side section with FIX-SD 80. TIP: Pre-pierce dowel holes using a cross slot screwdriver
The steps must not be continued to the wall. Allow to dry after gluing.
All element joints are to be reinforced with ARM-100 SK glass fibre reinforcement strips … …
… and level out with COL-AK. The surface is now ready for tiling. Further requirements (e.g. sealing for wet loads) must be taken into consideration in accordance with national directives.